Projects
UPSTREAM PROJECTS
CROSS COUNTRY PIPELINE PROJECTS
SURVEY & AS BUILDING PROJECTS
SURVEY SOFTWARES
FIRE FIGHTING SYSTEM PROJECTS
BULK OIL STORAGE TERMINAL
CONVERSION OF MOLASSES TERMINAL INTO PETROLEUM STORAGE TERMINAL
EDIBLE OIL/MOLASSES STORAGE TERMINAL
AVIATION TERMINAL/INTO PLANE FACILITY
UPSTREAM PROJECTS
DESCRIPTION OF UPSTREAM PROJECTS | QUANTITY |
(EC-0639) Badhra 13 Development & Wellhead Tie-In-Badhra FieldEni Pakistan | Eni Pakistan |
(EC-0694) Replacement of K-19 Flow Line Portions Dia. 10″ & Both Risers-Kadanwari Field | Eni Pakistan |
(EC-0689) Bhit/Water Handling job (Study for 10″ Badhra 9 Pipeline Water issue)-Bhit Field | Eni Pakistan |
(EC-0634) K-37 Booster Compressor & K-10 Nodal Compressor At NVS-Kadanwari Field | Eni Pakistan |
(EC-0698) Diversion for Bhit-11, Bhit-6 & Bhit 16 flow to Bhit-12 Compressors Bhit Field | Eni Pakistan |
Bhit/Badhra Water Handling Job (Installation of Scrubbers, Low Pressure Mini Blow Case & KO Pots at Bhit/Badhra Wellheads-Bhit Field | Eni Pakistan |
(EC-0699) Wellhead Metering Up gradation (Kirtthar)-Bhit Field | Eni Pakistan |
(EC-0699) Wellhead Metering Up gradation (Kirtthar) | Eni Pakistan |
(EC-0699) Wellhead Metering Up gradation (Kadanwari) | Eni Pakistan |
(EC-0690) Alternative Energy Kadanwari (Feasibility Study) | Eni Pakistan |
(EC-0655) Badhra Gathering Header Optimization 16″ & 10″ Crossovers | Eni Pakistan |
(EC-0634) K-37 Booster Compressor & K-10 Nodal Compressor Installation at NVS (As Building of K-10,11,12 & 21 FOC Network) Kadanwari Gas Field. | Eni Pakistan |
(EC-0708) K-38 Cross Over Line To Compressor C-1 at EVS (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0710) SVS Water Handling Job (Rearrangement in SVS CII, CIII & CV, CVI SC& BC to Cater High Level Liquid arrival Rate from K-27 & K-29 Wells) Kadanwari Gas Field. (Kadanwari Gas Field). | Eni Pakistan |
(EC-0634) K-37 Booster Compressor & K-10 Nodal Compressor Installation at NVS (Piping Modification at Suction & Discharge) Kadanwari Gas Field. | Eni Pakistan |
(EC-0634) K-37 Booster Compressor & K-10 Nodal Compressor Installation at NVS (3rd Party HAZOP) Kadanwari Gas Field. | Eni Pakistan |
(EC-0634) K-37 Booster Compressor & K-10 Nodal Compressor Installation at NVS (Design for K-37 Operating Platform) Kadanwari Gas Field. | Eni Pakistan |
(EC-0712) SVS C-5 Compressor Relocation To WVS (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0712) South Valve Station C6 Compressor Relocation To WVS (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0654) Kadanwari Communication, F&G, ESD System WH, Compressors & Valve Stations (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0481) Bhit Plant Optimization Study (Bhit Plant Electrical Load Study To Spare Loads from Gas Turbines) | Eni Pakistan |
(EC-0689) Bhit/Badhra Water Handling (Engineering Package for Installation of Suction Scrubber at Bhit-15) | Eni Pakistan |
(EC-0686) Kadanwari EVS, WVS Vibration Analysis | Eni Pakistan |
(EC-0690) Alternative Energy Kadanwari (Geo-Technical Survey) | Eni Pakistan |
(EC-KAD) Kadanwari Communications & Control Systems Upgrade | Eni Pakistan |
(EC-KAD) SVS Phase-III (Re-Staging of CI & CII Compressors) Kadanwari Gas Field. | Eni Pakistan |
(EC-710) SVS Water Handling Job (Re-Evaluate Pressurization Line Off Take & Shift To Up Stream for SVS C-5 & C-6) (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0630) New Engineering Study for Kirthar Compressors (10″ Flow Line from Bhit-15 Line To Bhit-3 BC Inlet & Bhit-9 To Bhit-3 BC discharge. | Eni Pakistan |
(EC-0630) New Engineering Study for Kirthar Compressors (Piping for BHIT-13 WH to Bhit-8 Booster Compressor Suction) | Eni Pakistan |
Public Hearing for Kadanwari Solar Project | Eni Pakistan |
(EC-0630) New Engineering Study for Kirthar Compressors (Engineering for Flow Line Dia. 10″ from Bhit-5 To Bhit-7) | Eni Pakistan |
(EC-Kirthar) Study & Detailed Engineering For Relocation of Bhit-10 1.9MW Generator from Bhit-10 To Camp-4 | Eni Pakistan |
(EC-0615) Relocation of NVS Slug Catcher & Blow Case To WVS & K-37 Compressor Slug Catcher & Blow Case To NVS(Relocation of NVS Slug Catcher & Blow Case To WVS) Kadanwari Gas Field. | Eni Pakistan |
Electricity Of Eni Office Peak & Off Load Requirement Of Power Consumer | Eni Pakistan |
(EC-0712) Provision of Updated PFDs, Safety & Escape Plan of WVS & SVS (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0630) New Engineering Study for Kirthar Compressors Phase III (Relocation of Bhit-15 Booster To Bhit-7) | Eni Pakistan |
(EC-0630) New Engineering Study for Kirthar Compressors Phase III (Reconfiguration of Bhit-6 & Bhit-11 Booster) | Eni Pakistan |
(EC-0630) New Engineering Study for Kirthar Compressors Phase III (Relocation of Bhit-5 Booster Compressor at Bhit-2 Wellhead) | Eni Pakistan |
EC-Kirthar Study for Transferring Water from Bore Hole To Camp IV | Eni Pakistan |
EC-Abandonment Cost Estimation Kadanwari, Kirthar, Sukhtpur Lundali | Eni Pakistan |
(EC-0615) Detailed Study and Design to eliminate liquid draining from WVS using available Tools and Equipments (Kadanwari Gas Field.) | Eni Pakistan |
Bhit Air Field | Eni Pakistan |
(EC-KAD) Evaporation Pond At WVS (Feasibility of Evaporation Pond at WVS with estimated Size & Design of Skimmer) Kadanwari Gas Field. | Eni Pakistan |
(EC 0605) Replacement of Amine Units Corroded Piping at Train ½ (BHIT Field). | Eni Pakistan |
(EC-0612) Design Review of AG Skid Flame Detectors on Bhit / Badhra Wellhead Compressors | Eni Pakistan |
(EC-0537) Bhit Wellhead Compression Phase-II (Designing Work for Node-3) | Eni Pakistan |
(EC-0537) Bhit Wellhead Compression Phase-II (Designing Work for Node-4) | Eni Pakistan |
(EC 0546) Three New Compressors Purchase & Installation at SVS (OFF SKID) Kadanwari Gas Field. | Eni Pakistan |
(EC 0546) Three New Compressors Purchase & Installation at SVS (Inter Skid Piping) Kadanwari Gas Field. | Eni Pakistan |
(EC 0546) Three New Compressors Purchase & Installation at SVS (HAZOP) Kadanwari Gas Field. | Eni Pakistan |
(EC-0566) K-38 Development & Wellhead Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0599) SVS Compressor C 4 Re-location to K-23 Wellhead (Civil Foundation of SVS C-4 Compressor) Kadanwari Gas Field. | Eni Pakistan |
(EC-0582) Alteration in WVS C-1 Compressor Recycle Line (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0614) WVS Produced Water Handling (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0599) SVS Compressor C 4 Re-location to K-23 Wellhead (Inter skid Piping of SVS 4th Compressor) Kadanwari Gas Field. | Eni Pakistan |
(EC-0614) WVS Produced Water Handling (C-1 Compressor Fuel Gas System) Kadanwari Gas Field. | Eni Pakistan |
(EC-0604) Badhra-11 Development & Wellhead Tie-In | Eni Pakistan |
(EC-0615) Installation of Scrubber at K-19 Flow Line at WVS Kadanwari Gas Field. | Eni Pakistan |
(EC-0599) Re-Staging K-23 Compressor, SVS C-4 Compressor Re-Location to K-23 (Off Skid Piping) Kadanwari Gas Field. | Eni Pakistan |
(EC-0566) K-38 Development & Wellhead Tie-In (Flow Line 10″ Package) Kadanwari Gas Field. | Eni Pakistan |
(EC-0627) Liquid KO Facility on Bhit-2 (Buy Back Starter Gas Line) BHIT Field. | Eni Pakistan |
(EC-0634) Nodal Compressor Installation At K-10 (Kadanwari Gas Field). | Eni Pakistan |
(EC-0637) Baby Compressor Installation at K-37 (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0537) Bhit WH Compression Phase-II (Installation of Mini Blow Case Vessel & Associated Piping) | Eni Pakistan |
(EC-0537) Bhit WH Compression Phase-II (WH Compressors of Node-1, Node-2, Node -3 & Node-4) | Eni Pakistan |
(EC-0599) Re-Staging of K-23 Existing Compressor SVS C4 Compressor Refurbishment & its Re-Location (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0615) Study for Capacity Enhancement of Liquid Separation System & Replacement of Level Control / Shutdown Switches on all Kadanwari WHCs (South Valve Station) | Eni Pakistan |
(EC-0606) Up gradation of PLC on WVS C1 & K-23 Wellhead Compressors (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0632) Modification in Fuel Gas System in all KAD WHCs to cater Liquid Handling Issues (Kadanwari Gas Field) | Eni Pakistan |
(EC-0537) Bhit Wellhead Compression Phase-II (Design for Low Pressure Blow Down Case Vessel) | Eni Pakistan |
(EC-0615) Study for Capacity Enhancement of Liquid Separation System & Replacement of Level Control / Shutdown Switches on all Kadanwari WHCs (Design for Blow Case & Slug Catcher for C-II at EVS) | Eni Pakistan |
(EC-0641) Bhit/Badhra Relocation Jobs | Eni Pakistan |
(EC-0537) Bhit Wellhead Compression Phase-II (Design for Flow Line Dia. 10″ X 3.3 Km FROM Bhit-7 To Bhit-5) | Eni Pakistan |
(EC-KAD) K-11 Wellhead Piping Modification due to Replacement of X-Mass Tree, As per drilling request (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0583) Sun Shed for K-21, SVS C-1 & SVS C-2 WHC Control Panels at Kadanwari | Eni Pakistan |
(EC-0303) Provision of Fire Water Ring Main in Project Camp (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0634) K-37 Booster Compressor & K-10 Nodal Compressor at NWS (K-10 Inter skid System Design) Kadanwari Gas Field. | Eni Pakistan |
(EC-0652) Bhit & Badhra Fugitive Emissions Monitoring Campaign | Eni Pakistan |
(EC-0634) Nodal Compressor Installation at K-10 (Hazop Study) Kadanwari Gas Field. | Eni Pakistan |
(EC-0655) As Builting of Badhra Flow Line Network along with the route survey of Proposed Badhar 16 / 10 inch crossover and loop line of BN2 with Badhra 02 Compressor | Eni Pakistan |
Modification in flow line network for the provision of BN2 with Badhra 02 compressor | Eni Pakistan |
(EC-0615) Evaluation of Slug Catcher and downstream liquid handling system of KCF. Suggestion for possible modification for enhancement of its handling capacity (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0656) Detailed Process, Piping, Civil and I&E design of reconfiguration of SVS compressor such that C1, C2 and C3 will be in parallel operation with C5 & C6. Design shall provide maximum flexibility of operation of any well with HP and LP manifold (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0662) Installation of Working Platform & Cross Over at SVS, EVS & WVS Compressor Package (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0540) Test Separator Installation At All Bhit / Badhra Wells | Eni Pakistan |
(EC-0634) K-37 Booster Compressor & K-10 Nodal Compressor at NWS (Nodal Compressor Discharge & Suction Line at NVS HP header & 3rd Party HAZOP) Kadanwari Gas Field. | Eni Pakistan |
(EC-KAD) WVS C1 RAM Compressor discharge PSV Line Leakage (Kadanwari Gas Field). | Eni Pakistan |
(EC-0455) K-35 Development & Wellhead Tie-In (Kadanwari Gas Field) | Eni Pakistan |
(EC-0668) EVS C2 Startup Motor Fuel Gas Supply Line Modification (Kadanwari Gas Field) | Eni Pakistan |
(EC-0634) K-37 Booster Compressor & K-10 Nodal Compressor at NWS (Nodal Compressor Discharge & Suction Line at NVS HP header & 3rd Party HAZOP) (Kadanwari Gas Field) | Eni Pakistan |
(EC-0670) PFD’s for all Kadanwari Valve Stations | Eni Pakistan |
(EC-0676) Provision of New Separate Drain Lines from WVS-C1, C-2, MTS & Vent Stack to produced Water Pits at WVS (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0617) K-19 Flow Line Leakage Repair Work & Flow Line LRUT (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0686) EVS, WVS Vibration Analysis & Dynamic Stress Analysis at Actual Vibration Amplitude (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0687) Designing Work For the Replacement of Flexible Hose at motor Vent Line of WVS (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0688) Designing Work For the Replacement of Flexible Hose at motor Vent Line of EVS (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0634) K-37 Booster Compressor & K-10 Nodal Compressor at NWS (Working Platform around Compressor Engine Power Cylinders) Kadanwari Gas Field. | Eni Pakistan |
(EC-GEN) Design of Fuel Storage Tank At Forum Roof Top | Eni Pakistan |
(EC-KAD) Connection of New Slug Catcher with Old Slug Catcher Blow Cases (Hydraulic Analysis & Detailed Piping Design with BOQ for Connection of New SC with Old SC Blow Cases) Kadanwari Gas Field. | Eni Pakistan |
(EC-0739) Repair Works To Rectify Line Leakage on 10″ Pipeline from K-18 to WVS (Kadanwari Gas Field.) | Eni Pakistan |
(EC 0415) K-3 DIR B Wellhead Tie-in (Kadanwari Gas Field.) | Eni Pakistan |
(EC 0452) K-32 Development & WH Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0453) K-33 Development & WH Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0502) South Valve Station Phase-II (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0526) South Valve Compressor & Installation (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0530) K28/K30 To SVS Flow Line (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0533) Kadanwari Turn Around 2013 (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0440) K-1 Work Over Wellhead Tie-in Work (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0532) South Valve Station Second Compressor Installation (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0455) K-35 Development & WH Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0284) Cost Estimation for Abandonment of Eni Operated Assets (Kadanwari) | Eni Pakistan |
(EC-0433) K-31 HOR Wellhead Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-554) Risk Evaluation of all flow lines entering Kadanwari Central Facility | Eni Pakistan |
(EC-0486) K-36 Development & Wellhead Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0454) K-34 Development & Wellhead Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0588) K-21 Compressor Relocation to SVS (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0527) K-7 Development & Wellhead Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0564) K-4 Work Over Wellhead Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0546) Three New Compressor Purchase & Installation (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0487) K-37 Wellhead Development & Tie-in (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0455) K-35 Development & WH Tie-In (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0487) K-37 Wellhead Development & Tie-in (Stress Analysis) Kadanwari Gas Field. | Eni Pakistan |
(EC-0546) Three New Compressor @ SVS (5th & 6th Compressors) Kadanwari Gas Field. | Eni Pakistan |
(EC-0527) K-7 Wellhead Tie-In (Stress Analysis) Kadanwari Gas Field. | Eni Pakistan |
(EC-0596) Kadanwari Turn Around 2014 | Eni Pakistan |
(EC-0599) Installation of SAQIB Compressor at K-23 Well Location (Kadanwari Gas Field.) | Eni Pakistan |
(EC-0600) K-17 Wellhead Tie-In (Standard 8″) Kadanwari Gas Field. | Eni Pakistan |
(EC-0601) K-24 Wellhead Tie-In (Standard 8″) Kadanwari Gas Field. | Eni Pakistan |
(EC-0602) K-25 Wellhead Tie-In (Re-Size 4″) Kadanwari Gas Field. | Eni Pakistan |
(EC-0588) K-21 Compressor Relocation to SVS (Kadanwari Gas Field). | Eni Pakistan |
(EC-0546) Three New Compressor Purchase & Installation (Civil Foundation At K-27) Kadanwari Gas Field | Eni Pakistan |
(EC-0546) Three New Compressor Purchase & Installation (Civil Foundation At K-29) Kadanwari Gas Field | Eni Pakistan |
(EC-KAD) Equipment Master for Kadanwari Surface Facilities Kadanwari Gas Field | Eni Pakistan |
(EC-0284) Cost Estimation for Abandonment of Eni Operated Assets (Kadanwari Gas Field) | Eni Pakistan |
(EC 0513) Badhra North Development | Eni Pakistan |
(EC-0505) Badhra North 2 Dir | Eni Pakistan |
(EC-0467) Lundali Development & WH Tie-in | Eni Pakistan |
(EC-0523) GSM Coverage at Badhra Mountain | Eni Pakistan |
(EC-0418) Bhit 14 Development & WH Tie-In | Eni Pakistan |
(EC-0481) Amine Unit Debottle Necking & Solvent Swapping | Eni Pakistan |
EC-0506 Badhra B North 3 | Eni Pakistan |
EC-0506 Badhra B North Appraisal | Eni Pakistan |
EC-0421 Badhra 06 Wellhead & Tie-In | Eni Pakistan |
EC-0284 Cost Estimation for Abandonment of Eni Operated Assets (Bhit Field) | Eni Pakistan |
EC-0484 Possible New Suction Scrubbers (Bhit Field) | Eni Pakistan |
EC-0507 Bhit 16 Wellhead Tie-In (Bhit Field) | Eni Pakistan |
EC-BAD Water Pit at Badhra Mountain (Bhit Field) | Eni Pakistan |
EC-554 Risk Evaluation of 24″ Gathering Lines at Bhit Near Camp 2 (Bhit Field) | Eni Pakistan |
EC-0552 Fire Water System in CAMP IV (Bhit Field) | Eni Pakistan |
EC-0555 Enhancement & Replacement of Train 1 & 2 Regeneration Electric Heaters Bundles (1/2-E-0630) Bhit Field. | Eni Pakistan |
EC-0513 Badhra North Development (HAZOP Study) | Eni Pakistan |
EC-0221 Bhit Laboratory Renovation | Eni Pakistan |
Mobile Test Separator at Kirther (Bhit Field). | Eni Pakistan |
EC-0537 Bhit Compression Phase-II (Installation of Baby Compressor at Bhit 3, Bhit 9, Bhit 15) | Eni Pakistan |
EC-0537 Bhit Compression Phase-II (Node-2) | Eni Pakistan |
EC-0573 Installation of Rental Test Separator at Bhit-5 | Eni Pakistan |
EC-0584 Piping Modification for Bhit 11 Compressor Cooler | Eni Pakistan |
EC-0506 Badhra 9 Wellhead Development & Tie-In | Eni Pakistan |
EC-0590 Rehabilitation of Naing Bridge (Bhit Field) | Eni Pakistan |
EC-0589 Conversion of Recreational Facility & Medical Block (Bhit Field) | Eni Pakistan |
(EC-0593) Divert Bhit-10 Flow Towards Bhit-8 | Eni Pakistan |
(EC-0574) Bhit -5 Cooler Modification | Eni Pakistan |
(EC-0569) Badhra 10 Wellhead Development & Tie-In. | Eni Pakistan |
D-9 Road Restoration (Bhit Field) | Eni Pakistan |
(EC-0284) Cost Estimation for Abandonment of Eni Operated Assets (Bhit) | Eni Pakistan |
Detailed Engineering Design of K-6 Compressor Package At West Valve Station | Eni Pakistan |
Detailed Engineering Design of K-3 Wellhead Surface Facility & Tie-In | Eni Pakistan |
Detailed Engineering Design of K-31 Wellhead Surface Facility & Tie-In | Eni Pakistan |
Detailed Engineering & Architectural Design of Cafeteria/Mess Facility at F-9 Bungalow | Eni Pakistan |
Detailed Engineering Design of Change in Material of Amine Contactor Columns Internal Trays for Better Corrosion Resistance | Eni Pakistan |
Detailed Engineering Design of K-33 Wellhead Surface Facility & Tie-In | Eni Pakistan |
Detailed Engineering Design of Portable Pig Launcher/Receiver For Dia. 6” Flow Line | Eni Pakistan |
Detailed Engineering Design of Water Pit AT Badhra Mountain | Eni Pakistan |
Detailed Engineering Design of Bhit 15 Wellhead Surface Facility & Tie-In | Eni Pakistan |
Development of PALLI Deep Oil Facility (Bobi Oil field) | OGDCL |
As-Built of Dakhni (09) Wellheads (DAKHNI Oil field) | OGDCL |
Route Survey of all the Pipeline from the Downstream of Choke to Plant inlet (Approx. 47.8 Km) DAKHNI Oil field | OGDCL |
Route Survey & Pipeline of Jand-2 to Jand-1. (DAKHNI Oil field) | OGDCL |
Condensate Loading Pump (NASHPA Oil field) | OGDCL |
Adequacy & Engineering Design New Flare Header with Existing & New Flare Stack (NASHPA Oil field) | OGDCL |
Route Survey and Detailed Design of Khamiso to Maru Pipeline and As Building of Maru South and Reti Flow line & As Built Drawings of Reti-Maru (04) Wells. (QADIRPUR Gas field) | OGDCL |
As-Built of P&ID Qadirpur Gas Field (QADIRPUR Gas field) | OGDCL |
As-Built of Qadirpur Wellheads & Flow lines (New Wells & drawings Modifications) QADIRPUR Gas field | OGDCL |
Detailed Design of Condensate Storage Tanks (TANDO ALAM Oil field) | OGDCL |
Civil Design of Condensate Storage Tanks T(ANDO ALAM Oil field) | OGDCL |
Detailed Design of Crude Storage Tank for Thora Oil Field (TANDO ALAM Oil field) | OGDCL |
Capacity Assessment of 26 inch 47 KM UCH GAS PIPELINE (UCH GAS Field) | OGDCL |
As-Built of 15 Wellheads (UCH Gas Field) | OGDCL |
Detail study of UCH Piping system for 11 Wellheads (Layout, ISO, BOQ) UCH Gas Field | OGDCL |
Estimation of Pigging Slugs, RCA of Black Powder & Hydraulic Analysis of Tando Adam Pipeline (Bobi Gas Field) | OGDCL |
Designing of Fire Water Network at Palli Deep #1 (Bobi Gas Field) | OGDCL |
Detailed Design of Palli Deep Oil Handling Facility. (Bobi Gas Field) | OGDCL |
Detail Engineering of Well site Surface Facility for Soghari-2 (DAKHNI Oil Field) | OGDCL |
New Route Survey for Soghari-2 (4 KM) (DAKHNI Oil Field) | OGDCL |
Design Review for Requirement of inline Heater at Different Wells i.e. Dkn # 08 , Deep # 01 , Deep # 02 , Soghari # 01 & Jand # 01 & Evaluate the Requirment for Existing Inline Heater at Different Wells with current Production i.e. Dkn # 01 , Dkn # 03, Dkn # 04 & Dkn # 12 (DAKHNI Oil Field) | OGDCL |
Marking of Nashpa X-5 ROW of Flow Line on Ground (NASHPA Oil field) | OGDCL |
Nashpa 07 Route Survey, Wellhead Surface Facility & Flow line (NASHPA Oil field) | OGDCL |
• AME Tank / Etank 2000 (Design / Rating of Storage Tank)NASHPA EPF fire water loop/ hydrant design and BOQ for Nashpa (NASHPA Oil field) d>OGDCL | |
Concept Study For Produced Water Adequacy & Capacity Enhancement (QADIRPUR Gas field) | OGDCL |
UCH 26″ Dia. Pipeline replacing (UCH GAS Field) | OGDCL |
Remove Water Logged Area Over UCH Pipeline (UCH GAS Field) | OGDCL |
Stress Analysis of UCH Gas pipeline ( 47 KM ) & Site Supervision of 15 KM Pipeline Replacing (UCH GAS Field) | OGDCL |
Survey As Builting of BOBI Tando Adam Pipeline (BOBI GAS Field) | OGDCL |
Development of Pipeline Alignment Drawings & Stress Analysis of Suleman Well (BOBI GAS Field) | OGDCL |
Route Reconnaissance of Suleman 01 Pipeline To NAPRA Valve Assembly (30 Km) (BOBI GAS Field) | OGDCL |
Designing of Pig Launcher/Receiver for Suleman Well #1 Pipeline (BOBI GAS Field) | OGDCL |
Designing of Well site Surface Facility for Suleman #1 (BOBI Gas field) | OGDCL |
Detailed design of Bitrism WHSF, Flowline & Bitrsim Tie-in (BOBI Gas field) | OGDCL |
Survey As Builting, Hydraulic Analysis & Stress Analysis For Chakdim-5 # 1, Chakdim-5#2 And Mithrao Wells. (BOBI Gas field) | OGDCL |
Route Survey for Jand-1 & Soghari-1 Pipeline to Dakhni Plant (DAKHNI Gas field) | OGDCL |
Detailed design of JAND-I & SOGHARI-I Wellhead Assembly & Flow Line (DAKHNI Gas field) | OGDCL |
Development of Soghari-2 Pipeline & As-Built of Plant inlet manifold, Storage Area (DAKHNI Gas field) | OGDCL |
Soghari Wellheads Design as per HIPPS philosophy (DAKHNI Gas field) | OGDCL |
Jand Wellheads Design as per HIPPS philosophy (DAKHNI Gas field) | OGDCL |
Detailed design of Nashpa 05 & 06 Wellhead Assembly & Flow Line (NASHPA Field) | OGDCL |
Development of As-Built Drawings of Nashpa EPF Plant & Nashpa Wells #1,2,3 & 4 (NASHPA Field) | OGDCL |
As Built Topographic Map of Flow Lines of Qadirpur Gas Field (20 Km) (QADIRPUR Gas Field) | OGDCL |
As Built Topographic Map of Flow Lines of Qadirpur Gas Field (35 Km) (QADIRPUR Gas Field) | OGDCL |
As Built Drawings of Reti-Maru Wells & Gas Gathering System (QADIRPUR Gas Field) | OGDCL |
Detailed Design of Crude oil Storage Tanks (Kunar Gas Field) | OGDCL |
As Built Drawings of QadirPur Wells & Gas Gathering System (QADIRPUR Gas Field) | OGDCL |
Survey of Salamat-Naimat Flow Line 25 Km (Salamat Field) | UEP |
Technical Bid Evaluation of Naimat LPG Plant Revamp (Naimat Field) | UEP |
Bukhari Fire Fighting Study (Bukhari Field) | UEP |
Preparation of Scope of Work & ITB for Naimat LPG Plant Revamp Project (Naimat Field) | UEP |
Detailed Design of Rajani Remote To Kausar Facility Flow Line (Kausar Field) | UEP |
Evaluation of Tangri Plant at Salamat Raw Gas Composition (Tangri Field) | UEP |
Rajani 04 Flow Line Stress Analysis 12″ X 3Km (Rajani Field) | UEP |
Naimat LPG Plant Revamp Study (Naimat Field) | UEP |
Evaluation of Tangri Plant at Korai Raw Gas Composition (Tangri Field) | UEP |
Acid Gas Dispersion Modeling of Naimat III Plant (Naimat Field) | UEP |
Acid Gas Dispersion Modeling of Naimat IV Plant (Naimat Field) | UEP |
Compressor C-1810 Installation at Bilal X-1 (Bilal Field) | UEP |
Fire Hazard Analysis of Tangri Plant (Tangri Field) | UEP |
Stress Analysis of 12″ X 17Km Pipeline RAKA Flow Line Phase-II (Rajani) | UEP |
Compressor C-4205 Relocation from JABOO (JABO Field) | UEP |
Compressor C-1810 Relocation from Makhdumpur (Makhdumpur Field) | UEP |
Compressor C-4205 Installation at Makhdumpur (Makhdumpur Field) | UEP |
P-6817 Dismantling From Duphri & Installation At Rind Remote (DuphriField) | UEP |
Rajani 04 Surface Facility Design (Rajani Field) | UEP |
Detailed Pipeline Design from Rajani 04 to Rajani remote (Rajani Field)) | UEP |
Pipeline Assessment from Rajani remote to Salamat (Salamat Field) | UEP |
Pipeline Assessment from Salamat to Naimat (Salamat Field) | UEP |
Detailed Design of proposed modification at Rajani remote to Salamat (Salamat Field) | UEP |
Detailed Design of proposed modification at Salamat to Naimat flow line (Sajan Field) | UEP |
Detailed Design of proposed modification at Sajan flow line (Malkani Field) | UEP |
Detailed Design/Stress analysis of Malkani 01 flow line (Naimat Field) | UEP |
Naimat Fire Hazard Analysis Study (Naimat Field) | UEP |
Conceptual study for 96% C3 Recovery Plant at Naimat (Naimat Field) | UEP |
RCA Study for Amine Foaming at Naimat 5A & 5B plant (Naimat Field) | UEP |
Detailed Process Design of Fire Reboiler Installation at Naimat II (Naimat Field) | UEP |
Process Review of Installation of Coolers at Glycol Plant (Naimat Field) | UEP |
Contractor As Built Verification of Naimat V (Naimat Field) | UEP |
Naimat LPG Plant Revamp Study (Naimat Field) | UEP |
Development of Fire Scenarios with recommendations on Fire Fighting System at Naimat Phase-IV (Naimat Field) | UEP |
Detailed Engineering Design of Gas Compressor C-12101 Installation at Lodano (Naimat Field) | UEP |
Pre-Feasibility Study to set the baseline Cost & Evaluate the Economical Feasibility for New 100MMSCFD Plant (With LPG) (Naimat Field) | UEP |
Detailed Engineering Design to relocate & Compressor Installation at KOLI (Koli Field) | UEP |
Installation of New Amine Still Column at Kausar (Kausar Field) | UEP |
Kausar Amine Plant Simulation (04 Nos. Cases- I,II,III,IV) (Kausar Field) | UEP |
Turk Amine Plant Simulation (TurkField) | UEP |
Fire Water Storage Requirement at Naimat Field | UEP |
Naimat Phase-II Simulation (02 Nos. Cases- I,II) at Naimat Field | UEP |
Naimat Amine Plant Phase IV Simulation (Train I & II) at Naimat Field | UEP |
Pre Feed Study of 100MMSCFD of Naimat West Gas Field | UEP |
Stress Analysis of Buy Back Fuel Gas Line (Sui Gas Field) | PPL |
Installation of VFD Pumps at Dehydration Plant (Kandhkot Gas Field) | PPL |
Hydraulic & Stress Analysis of Southern Gas Header (Sui Gas Field) | PPL |
Expansion Bend / Joint Study at Northern Raw Gas Header at Sui Gas Field (Sui Gas Field) | PPL |
Topographic of ADHI 19 F/L & As Built Survey of ADHI 12 & 19 (Aadhi Gas Field) | PPL |
Evaluation Of Existing Liquid Handling System At Kandhkot Gas Field & Proposed Modification (Kandhkot Gas Field) | PPL |
Detailed Study for Installation of Inlet Evaporative Cooler at Sui Gas Field | PPL |
Hydraulic & Stress Analysis of Sales Gas Metering at Sui Gas Field | PPL |
Cooler Installation at SML & SUL Compressors SGF (Sui Gas Field) | PPL |
Relocation of Pakistan Petroleum Limited Chachar Plant To Shahdad (Chachar Gas Field) | PPL |
Survey & Designing of Access Road for Lakki Zindan Block | PPL |
Design Review of 3-Phase Low Pressure Separator SV-84301 at Adhi Field | PPL |
As Built Drawings of Chachar Plant for Gambat South EWT Project (Gambat South Field) | PPL |
Survey & Designing of Access Road for Lakki Zindan Block | PPL |
Design Review of 3-Phase Low Pressure Separator SV-84301 at Adhi Field | PPL |
As Built Drawings of Chachar Plant for Gambat South EWT Project (Gambat South Field) | PPL |
Study of Kandhkot Dehydration Plant Gas Venting & Emergency Shutdown System | PPL |
Heat Radiation & Gas Dispersion Modeling of Fire & Gas Detection System at 25 Nos. Wellheads and Dehydration Plant at Kandhkot | PPL |
Design & Engineering of Enhancement of Hydrocarbon Management System Project. (Makori west) | MOL Pakistan |
Fire Water Demand Calculation for PARCO Decanting Facility (PARCO MCR) | MOL Pakistan |
Design & Engineering for Permanent Facility for Produced Water Treatment Injection Project (Makori west) | MOL Pakistan |
Consultancy Services for Crude Decanting Facility at PARCO (PARCO MCR) | MOL Pakistan |
Manzalai Storm Water Disposal Study (Manzalai) | MOL Pakistan |
Augmentation Study for Oil Capacity Enhancement at Manazalai CPF (Manzalai) | MOL Pakistan |
Detailed Engineering for Integration of Front End Compressor at Sujawal X-1 (Kalabagh) | Mari Petroleum Co. Ltd. (MPCL) |
Detailed Engineering at KALABAGH Field (Sujawal) | MPCL |
Detailed Engineering of Sujawal Gas Field (Halini X-1) | MPCL |
Detailed Design of Pipeline Route from Halini Deep To Halini X-1 | MPCL |
Hazop Analysis of Zarghun Gas Processing Facility (Zarghun) | MPCL |
Consultancy Services for Revamping of Sujawal Gas Field | MPCL |
Topographic Survey of Gas Pipeline from Sujjal-1 To Sujawal-1, Sujawal Block | MPCL |
Hazards & Hazop for Integration of Rizq-1, Rehman-2, Rehman-3 Wells (Rehman-2&3, Rizq-1) | Polish Oil & Gas Pakistan (PGNIG) |
Detailed Engineering Works for Integration of RIZQ-1, REHMAN-2 & REHMAN-3 Wells into Production AMBIT (Rehman-2&3, Rizq-1) | PGNIG |
Project Management Services for Access Road & Well Site Development for Rehman 2 & 3 Wells (Rehman-2&3) | PGNIG |
Design and Detailed Engineering of Mounded LPG Bullets (dia. 4m x 38m length) of Makori Gas Fields Development project. | Prescon Descon International Ltd. |
Rehmat-2 Wellhead Compression Project | Petronas Garigali (Pakistan) Ltd. |
Kausar-Usman Wellhead Compression Project | Orient Petroleum International Inc. |
Umer Wellhead Compression Project | Orient Petroleum International Inc. |
Detailed Engineering For Adhi EPF Revamp Project of PPL | Prescon Descon International Ltd. |
Design and Engineering of CP system of Mehar Gas Fields flowlines and Trunkline | SPEC Energy DMCC |
Pipeline Scaling Study For Mehar Gas Fields | SPEC Energy DMCC |
Dynamic Analysis (Flow Assurance) of Mehar wellhead 01, 02 and 03 Flow Lines | SPEC Energy DMCC |
Survey and Detailed Engineering of Flow Lines & Trunk Lines of Mehar Gas Field Pakistan | SPEC Energy DMCC |
Acid Off Gas Dispersion Modeling | BHP Billiton |
Extraction of Iso-Pentane at Gas Processing Plant, Atuabo-Ghana | GTG Services Ghana. |
Manzali Wellhead Compression Project. (include 12 nos. Compressors) of MOL Pakistan. | GASCO Engineering Co. |
CROSS COUNTRY PIPELINE PROJECTS
CROSS COUNTRY PIPELINE PROJECTS | QUANTITY |
Route Selection and Topographic Survey of 42” Dia. x 340 Km Long LNG Pipeline from SMS Pakland to MVA Nara (Chundko) | SSGC Pakistan |
Route Selection and Topographic Survey of 42” Dia. x 25 Km Long LNG Pipeline from MVA Nara to Swan. | SSGC Pakistan |
Route Selection, Topographic Survey and Basic Engineering of Mozambique-Malawi White Oil Pipeline 380 Km long from Beira Port Mozambique to Nsanje city Malawi. | Venessia Petroleum-Qatar |
Basic Engineering of Mozambique -Zimbabwe Crude Oil & White Oil Pipeline 250 Km long from Beira Port Mozambique to Feruka-Zimbabwe. | Venessia Petroleum-Qatar |
Route Selection, Topographic Survey and Engineering of 123 km long LPG Pipeline form Gas Processing Plant at Atuabo to Pumpuni. | Bulk Oil Storage and Transportation Company (BOST) Ghana. |
Survey and Detailed Engg. of Fuel Gas Supply Pipeline from West African Gas Pipeline (WAGP) Tie-in to Takoradi Thermal Power Plant – Ghana | GeCad-Ghana |
Survey and Detailed Engg. of Fuel Gas Supply Pipeline from West African Gas Pipeline (WAGP) Tie-in to Tema Power Plant – Ghana | GeCad-Ghana |
Basic Engineering of Fuel Gas Supply Network for Power Plants, Industries and Residential Areas of Tema City – Ghana | GeCad-Ghana |
Topographic Survey and Detailed engineering of Re-Routed 65 km long existing Crude Oil Pipeline dia. 16”. | Pak-Arab Refinery Co. |
Detailed Engineering Design of KCF Flow Line parallel To Existing K-27 Flow Line | Eni Pakistan |
Detailed Engineering Design of Portable Pig Launcher/Receiver For Dia. 6” Flow Line | Eni Pakistan |
Topographic Survey and Detailed engineering of Reti Maru Natural Gas Pipe Line 25 km long | Engro Fertilizers Limited |
Design and detailed engineering of Zamzama Gas Condensate Pipeline (30 Km long) and Condensate storage and injection facility at Bubak. | Bhp Billiton |
Detailed Engineering of Flow Lines & Trunk Lines of Mehar Fields Pakistan | SPEC Energy DMCC |
Fuel Gas Supply PipelineTo 126MW Power Plant at TEMA City Ghana | GTG Services-Ghana |
Survey and Detailed Engineering of Naimat Basal Gas Export Pipeline Dia. 8”-14.2 km Long for Orient Petroleum Inc. (OPI). | Orient Petroleum International Inc. |
Survey and Detailed Engineering of Umer Gas Export Pipeline Dia. 6”-34 km Long for OPI. | Orient Petroleum International Inc. |
Topographic Survey, Design and Detailed Engineering of Chachar Gas Pipeline Dia. 14”-45 km Long for Tullow (Developments) Ltd. | Orient Petroleum International Inc. |
Design and Detailed Engineering of PARCO Gas Condensate Pipeline Dia. 6”-40 km Long for BHP Billiton and PARCO . | Pak-Arab Refinery Ltd. |
Stress Analysis of New NGBC Project at Engro Fertilizer Plant-Dharki | Engro Fertilizers Limited |
Re-Routing of Effluent Line at PRL Korangi | Pakistan Refinery Limited |
Construction of New Gas Pipeline Dia. 16″-11 KM long | Engro Fertilizers Limited |
Feasibility Study of Re-location of PRL Products Pipelines from PRL Keamari Terminal to PRL Refinery Korangi. | Pakistan Refinery Limited |
Feasibility Study, Design and Detailed Engineering of Interconnection of Tanker Discharge Pipeline of OMCs and PARCO at Keamari. | Pakistan State Oil Company Limited |
Feasibility Study For Direct Pumping Of HSD From Port Qasim (WOTS-I) To Shikarpur (WOTS-II) | Pak Arab Pipeline Company Limited |
Feasibility Study For Additional Storage Tank At (WOTS-II) Shikarpur | Pak Arab Pipeline Company Limited |
Conversion of Hub River Fuel Oil Pipeline into White Oil Pipeline | Byco Petroleum Limited |
Oando LPG Dia. 10″ Pipeline from Jetty to Lagos Terminal | Tessmick Nigeria Limited |
Feasibility Study of White Oil Pipeline 50 km long from Keamari Port to Port Qasim for PSOCL. | Pakistan State Oil Company Limited |
Hydraulic Analysis of Gas Gathering Pipeline-9Km long from West Valves Station to Kadanwari Central Facilities of ENI Pakistan for GASCO | Eni Pakistan |
Hydraulic Analysis of Gas Gathering Pipeline-20Km long from wellhead K14/K15 to Kadanwari Central Facilities of ENI Pakistan for GASCO | Eni Pakistan |
Flexibility Analysis of Total Export Gas To PEC Temporary Power Station | TG Yemen |
Topographic survey and Detailed Engineering of Ratana – Meyal Gas Pipeline | Orient Petroleum International Inc. |
EC-554 Risk Evaluation of 24″ Gathering Lines at Bhit Near Camp 2 | Eni Pakistan |
Detailed Engineering Design of KCF Flow Line parallel To Existing K-27 Flow Line | Eni Pakistan |
Reconnaissance Survey and Basic Engineering of White Oil Pipeline Project from PARCO Mehmoodkot to Taru Jabba 825 km approx. | Frontier Works Organization (FWO) |
SURVEY & AS BUILDING PROJECTS
SURVEY & AS BUILDING PROJECTS | QUANTITY |
Bathymetric Survey of River Indus for 42” Dia. X 340 Km LNG Pipeline | SSGC Pakistan |
Route Survey of Badhra Appraisal North East Well Location | Eni Pakistan |
Survey for Water Pit At Badhra Mountain | Eni Pakistan |
Topographic Survey and As-Built of underground pipelines of Reti-Maru Natural Gas Pipeline | Engro Fertilizers |
Pipeline Survey 12″ Trunk Line from North Manifold to GPF at Mehar Gas Field | SPEC Energy DMCC |
Selection of Route and Topographic Survey of 123 km long pipeline route of BPT. | Bulk Oil Storage and Transportation Company (BOST) Ghana. |
Reconnaissance Survey of Atuabo-Kumasi Pipeline 325 km long | GTG Services |
Bathymetric Survey of BPT Jetty at Pumpuni-Ghana | Bulk Oil Storage and Transportation Company (BOST) Ghana. |
Topographic survey of Ratana – Meyal Gas Pipeline | Orient Petroleum International |
Topographic Survey of Tarujabba, Chaklala and Machike Depots | Shell Pakistan Limited |
Topographic Survey of Halini Production Facilities | Mari Gas Company Limited |
Topographic Survey of Sujawal X-I | Mari Gas Company Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification, 3D Model) of Tsing YI Island Installation Hong Kong | Shell Hong Kong Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of NDP Installation at Keamari | Shell Pakistan Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of DP Installation at Keamari | Shell Pakistan Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification, 3D Model) at Machike Installation | Shell Pakistan Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Chaklala Installation | Shell Pakistan Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Eastern Joint Hydrant Depot | Shell Pakistan Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Sukkar Airport | Shell Pakistan Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Mina Al-Fahal Depot-Muscat | Shell Oman Marketing S.A.O.G |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Jebel Ali Terminal-UAE | Shell Market Middle East |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Chemical Terminal, Jebel Ali-UAE | Shell Market Middle East |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Fuel Farm Facility of Katoka Airport-Accra | Shell Ghana Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Bulk Oil Storage Terminal-Thilawa Region-Yangon | National Infrastructure Holdings Co.-Myanmar |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Fuel Farm Facility of Islamabad Airport | Shell Pakistan Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Taru Jabba Depot | Shell Pakistan Limited |
Topographic Survey of Bulk Oil Storage Terminal at Machike | Hascol Petroleum Ltd. |
Topograhic Survey of Bulk Oil Storage Installation at Faislabad | Pakistan State Oil Company Limited |
As Built Documentation (Topographic Survey, Buried Pipelines locations with depth) and development of As-Built Pipeline Alignment Drawings of Wellheads, flowlines and manifolds of Adhi Gas Fields | Pakistan Petroleum Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Dhurnal LPG Plant | Chevron Pakistan Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Quetta Depot | Shell Pakistan Limited |
As Built Documentation (P&IDs, Equipment Layout, Piping Layouts, SLD, Hazardous Area Classification) of Karachi-Terminal | Chevron Pakistan Limited |
SURVEY SOFTWARES
SURVEY SOFTWARES | QUANTITY |
RTK GNSS Lieca GS 14 & GS 8 Plus (Accuracy ± 8mm) | 02 Nos. |
GPS Trimble SPS 855 (Accuracy ± 8mm) | 01 No. |
GPS Trimble R3 & R4 (Accuracy ± 8mm) | 02 Nos. |
Spectra Epoche 10 GPS (Accuracy ± 10mm) | 02 Nos. |
Sokkia STATUS G.P.S (Accuracy ± 5mm) | 02 Nos. |
Power Set 2000 (Sokkia) (Accuracy ± 2 sec) | 01 No |
Total Station Set 2100 (Sokkia) (Accuracy ± 2 sec) | 02 Nos. |
South Differential G.P.S (Accuracy ± 5mm) | 02 Nos. |
Total Station Set 630RK (Sokkia) (Accuracy ± 5 sec) | 01 No. |
Total Station Set 610(KB) (Sokkia) (Accuracy ± 5 sec) | 01 No. |
Total Station South 950TS (Accuracy ± 2 sec) | 01 No. |
Total Station Spectra Focus 10 (Accuracy ± 5 sec) | 01 No. |
Power Set 2030 R-3 Sokkia (Accuracy ± 2 sec) | 01 No. |
Garmin Etrex | 05 Nos. |
Power Level Sokkia (Accuracy ± 1mm) | 01 No. |
Auto Level Sokkia | 04 Nos. |
Pipe Locator Lieca 550 I with Transmitter 100 XT (Accuracy ± 10%) | 01 No. |
Pipe Locator Green Lee with Transmitter 500 (Accuracy ± 10 %) | 01 No. |
Echo Sounder Samyung (Accuracy ± 25mm) | 02 Nos. |
Lieca Geo-System | |
Trimble Business Center | |
12D Model | |
AutoCAD | |
Spectra Precision Survey Office | |
Sokkia link | |
Garmin MAP Source | |
MAP Site | |
EAGLE Point | |
PROLINK (Sokkia) | |
SDR MAPPING | |
South Processing | |
Spectrum survey | |
CAD Works | |
LIS cad | |
Google Earth pro | |
Instant Architect |
FIRE FIGHTING SYSTEM PROJECTS
FIRE FIGHTING SYSTEM PROJECTS | QUANTITY |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Francistown Depot-Botswana | Vivo Energy Botswana |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Grootfontein Depot-Namibia | Vivo Energy Namibia |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Tsumeb Depot-Namibia | Vivo Energy Namibia |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Windhoek Terminal-Namibia | Vivo Energy Namibia |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Windhoek Depot-Namibia | Puma Energy Namibia |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Windhoek Terminal-Namibia | Engen Namibia (Pty) Ltd. |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Windhoek Terminal-Namibia | Total Namibia (Pty) Ltd. |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Bitumen Plant-Takoradi | Vivo Energy Ghana |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Shimanzi Installation-Mombasa | Vivo Energy Kenya |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Nairobi Terminal-Nairobi | Vivo Energy Kenya |
(Shell Licensee in Africa) | |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of PRL Terminal Keamari | Pakistan Refinery Ltd |
Technical Audit, Design and Detailed Engineering of Fire Fighting system of Pakistan Refinery-Korangi including Heat Radiation Modeling. | Pakistan Refinery Ltd |
Technical Audit of Existing Fire Fighting System with detailed engineering at Machike Installation. | Shell Pakistan Limited |
Technical Audit of Existing Fire Fighting System with detailed engineering at Keamari (NDP & DP) Installations. | Shell Pakistan Limited |
Technical Audit of Existing Fire Fighting System with detailed engineering at Chaklala Installation. | Shell Pakistan Limited |
Technical Audit of Existing Fire Fighting System with detailed engineering at Tarujabba Depot. | Shell Pakistan Limited |
Technical Audit of Existing Fire Fighting System with detailed engineering at Shikarpur Installation. | Shell Pakistan Limited |
Technical Audit of Existing Fire Fighting System with detailed engineering at Quetta Depot. | Shell Pakistan Limited |
Technical Audit/Gap Analysis of Existing Fire Fighting System at Zamzama Plant | BHP Petroleum Pakistan (PTY) Limited |
Technical Audit, Design and Detailed Engineering of Fire Fighting system of Byco Refinery-1 including Heat Radiation Modeling. | Byco Petroleum Limited |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Sahiwal Depot | Shell Pakistan Limited |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Bhakkar Depot | Shell Pakistan Limited |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Shershah Depot | Shell Pakistan Limited |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Vehari Depot | Shell Pakistan Limited |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of Daulatpur Depot | Shell Pakistan Limited |
Technical Audit/Gap Analysis of Existing Fire Fighting System and Detailed Engineering of LPG Terminal-Lahore | Pakistan State Oil Co. Ltd. |
Design and Detailed Engineering of Fire Fighting system at Wadi Latham, Safah, Khamila and Jalal Fields | Occidental of Oman Inc |
Technical Audit of Existing Fire Fighting System with detailed engineering at Mina Al Fahal Installation. | Shell Oman Marketing SAOG |
Safety and Consequence Study (Fire Fighting Gap Analysis with Heat Radiation Modeling) of Existing Fire Fighting System at Shell Tsing Yi Installation-Hong Kong | Shell Hong Kong Ltd. |
Technical Audit of Existing Fire Fighting System with Gap Analysis at Sibu Sarawak Depot | Shell Timur |
Safety and Consequence Study (Fire Fighting Gap Analysis with Heat Radiation Modeling) of Existing Fire Fighting System at | Shell Fiji Ltd. |
Safety and Consequence Study (Fire Fighting Gap Analysis with Heat Radiation Modeling) of Existing Fire Fighting System at Shell CNS Terminal-Thailand | Shell Company of Thailand |
Safety and Consequence Study (Fire Fighting Gap Analysis with Heat Radiation Modeling) of Existing Fire Fighting System at Shell | Shell Kenya Ltd. |
Safety and Consequence Study (Fire Fighting Gap Analysis with Heat Radiation Modeling) of Existing Fire Fighting System at Shell & Togo S.T.S.L. Depot-Togo | Shell & Togo |
Safety and Consequence Study (Fire Fighting Gap Analysis with Heat Radiation Modeling) of Existing Fire Fighting System at Shell Sibu Installation-Malaysia | Shell Timur |
Safety and Consequence Study (Fire Fighting Gap Analysis with Heat Radiation Modeling) of Existing Fire Fighting System at Shell Depot-Tunisia | Shell Tunisia |
Design of Fire Fighting system with Heat Radiation Modeling of Tullow Bangladesh | TG Engineering-Canada |
Design of Fire Fighting system with Heat Radiation Modeling of NRL Keamari Terminal . | National Refinery Ltd. |
Safety and Consequence Study (Fire Fighting Gap Analysis with Heat Radiation Modeling) of Existing Fire Fighting System at Korangi Terminal of Foundation Gas | Foundation Gas |
Design and Detailed Engineering of Fire Fighting System of LPG Plant # 1 near Pakistan Refinery Ltd. | Chevron Pakistan Ltd. |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at Zulfiqarabad Oil Terminal | Pakistan State Oil Company Limited |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at Keamari Terminal-A | Pakistan State Oil Company Limited |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at Keamari Terminal-B | Pakistan State Oil Company Limited |
Design and Detailed Engineering of Fire Fighting System of Oil Pier –II (BOP-II) of Karachi Port Trust | Meinhardt Pakistan Ltd |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at Sihala Depot of Pakistan State Oil Co. Ltd | Pakistan State Oil Company Limited |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at Faqeerabad Depot of Pakistan State Oil Co. Ltd | Pakistan State Oil Company Limited |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at PSO LPG Plant near NRL-Korangi | Pakistan State Oil Company Limited |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at Lalpir Depot of Pakistan State Oil Co. Ltd | Pakistan State Oil Company Limited |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at Machike Terminal of Pakistan State Oil Co. Ltd. | Pakistan State Oil Company Limited |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at Shikarpur Terminal of Pakistan State Oil Co. Ltd | Pakistan State Oil Company Limited |
Design of Fire Fighting system with Heat Radiation Modeling of Accra Airport Aviation Facilities-Ghana | Shell Ghana Ltd. |
Risk Based Gap Analysis of Existing Fire Fighting System and Design / Detailed Engineering of Fire Fighting system at Jinnah International Airport-Karachi. | Shell Pakistan Ltd. |
Fire Water Sprinkler System at Hall Al-Sawari | Al-Jazirah Engineering & Consultants |
Design of F&G System & Hazop Study for Well site & Dehydration Plant at Kandhkot Gas Field | Pakistan Petroleum Limited |
Technical Audit of Existing Fire Fighting System at PSO House (Basic & Detail Engineering) | Pakistan State Oil Company Limited |
Design of Fire Fighting System at Ware House Korangi | Pakistan Refinery Ltd. |
Technical Audit of Existing Fire Fighting System at Vehari Depot | Shell Pakistan Limited |
Technical Audit and Detailed engineering of Fire Fighting system at Jamshoro LPG Plant | Jamshoro Joint Venture Limited |
Technical Audit of Existing Fire Fighting System at Chitral Depot | Pakistan State Oil Company Limited |
Gap Analysis of Existing Fire Fighting System at Dhurnal Plant | SHV Energy Pakistan (PVT.) Limited |
Gap Analysis of Existing Fire Fighting System at Dhodak Plant | SHV Energy Pakistan (PVT.) Limited |
Technical Audit of Existing Fire Fighting System with detailed engineering at Mina Al Fahal Installation. | Shell Oman Marketing SAOG |
Technical Audit of Existing Fire Fighting System with Basic Design of Fire Fighting System of Lube Oil Blending Plant at Mina Al Fahal. | Shell Oman Marketing SAOG |
Technical Audit of Existing Fire Fighting System Lube Oil Blending Plant-Keamari. | Shell Pakistan Ltd. |
Technical Audit/Gap Analysis of Existing Fire Fighting System at Roche Bois Depot –Mauritius. | Vivo Energy Mauritius |
(Shell Licensee in Africa) | |
Basic Design with Heat Radiation Modeling of Fire Fighting System at Nanyuki Petroleum Depot | Crossbill Limited-Kenya. |
Basic Design with Heat Radiation Modeling of Fire Fighting System at Kisumu Petroleum Depot | Crossbill Limited-Kenya. |
Technical Audit/Gap Analysis of Existing Fire Fighting System at Bulk Oil Storage Terminal-Thilawa Region-Yangon. | National Infrastructure Holdings Co.-Myanmar |
BULK OIL STORAGE TERMINAL
BULK OIL STORAGE TERMINAL | QUANTITY |
FEED and Basic Engineering of Bulk Oil Storage (Refined Products and LPG) at Tema for Trust Logistic | Trust Logistic Terminal-Ghana |
FEED and Basic Engineering, Procurement Assistance, Construction Supervision & Commissioning of BOST Petroleum Terminal-Ghana | Bulk Oil Storage & Transportation Co. Ltd. (BOST) – Ghana |
FEED of Bulk LPG Installation at Essiama (near Takoradi). | GTG Services – Ghana |
FEED, Design and Detailed Engineering of 31 MW Atuabo Waste To Power Plant | GTG Services – Ghana |
Design and Detailed Engineering of Joint Users Hydrant Depot (JUHI Aviation terminal) at Katoka Airport-Accra | Shell Ghana Limited |
Inspection services of Storage Tank # 4 at JUHI Depot-Accra | Shell Ghana Limited |
Design and Detailed Engineering of Oily-water / Slop System at JUHI Depot-Accra | Shell Ghana Limited |
Design and Detailed engineering of Bitumen Additive Injection system at TYI Installation Hong Kong | Shell Hong Kong Limited |
Design and Detailed engineering of LPG Bulk Storage (mounded type) facility with Bottling Plant at Port Qasim. | SHV Energy Pakistan |
Design and Detailed engineering of LPG Bulk Storage facility at Dhodak | SHV Energy Pakistan |
Design and Detailed engineering of Bulk oil Storage Terminal at Machike | Hascol Petroleum Ltd. |
Design and Detailed engineering of Bulk oil Storage Terminal at Mehmood Kot | Hascol Petroleum Ltd. |
Design and Detailed engineering of Bulk oil Storage Terminal at Manga Mandi-Lahore | Premier Oil |
Design and Detailed engineering of Edible Oil Storage Depot at Port Qasim | Sufi Group of Companies |
Design and Detailed Engineering of Crude Oil Storage Installation at Port Qasim | Terminal-One (Pvt) Ltd. |
Design of Paraxylene Storage Facility at Lotte Chemical Plant at Port Qasim | Lotte Pakistan PTA Limited |
Design of Acetic Acid Storage Facility at Lotte Chemical Plant at Port Qasim | Lotte Pakistan PTA Limited |
Conversion of ACN Tanks into EDC Services | Engro Vopak Terminal Limited |
Design and Detailed Engineering of Bitumen Import, Storage and Loading Facility at Thilawa Port Region Terminal-Yangon. | National Infrastructure Holdings Co. |
Design and Detailed engineering of Bulk Oil Storage Installation at Machike | Attock Petroleum Limited |
Design and Detailed engineering of Bulk Oil Storage Installation at Rawalpindi | Attock Petroleum Limited |
Design and Detailed engineering of Bulk Oil Storage Installation at Faisalabad | Pakistan State Oil Co. |
Design and detailed engineering of AGO Storage Tanks | Shell Pakistan Limited |
Design and detailed engineering of Jet Fuel Storage Facility at NDP Installation | Shell Pakistan Limited |
Design, Procurement assistance and Construction management of GTL storage facility at Tsing Yi Island Installation | Shell Hong Kong Ltd. |
FEED and Detailed engineering of Replacement of existing Heaters and Boilers with new system at Tsing Yi Island Installation | Shell Hong Kong Ltd. |
Civil Foundation for Hot Charging Vessel VE-1202 | Engro Polymer & Chemicals Limited |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell Machike Depot | Shell Pakistan Limited |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell Keamari Depot | Shell Pakistan Limited |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell Chaklala Installation | Shell Pakistan Limited |
Pipeline Nitrogen Purging & Pigging system design | Shell Pakistan Limited |
Evaluation of existing beams & columns strength to check the additional load supporting strength | Chevron Pakistan Limited |
Conversion of Molasses Storage Terminal into Petroleum Storage Terminal at Keamari | Pakistan Molasses Company Ltd. |
Design of staging Platform | Pakistan Refinery Limited |
Development of Design Basis Document for Mina Al Fahal Terminal & PQS Terminal | Shell Oman Marketing Company |
Development of Design Basis Document for Jabel Ali Depot & Chemical Terminal | Shell Dubai Marketing Company |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell at Shikarpur Depot | Shell Pakistan Limited |
Construction of Condensate Storage Tank at Kandhkot Facility | Pakistan Petroleum Limited |
Construction of Water Storage Tanks at Sui Field | Business Supply & Technologies |
Conversion of T-301/T-302/T-303 into Lube Oil Storage Service at TYI | Shell Hong Kong Limited |
Installation of Thermal Relief System at Keamari Terminal | Chevron Pakistan Limited |
Provision for PMG Decantation at Rawalpindi Terminal | Chevron Pakistan Limited |
ALEXIA 50 Loading System at LOBP Jetty Tsing Yi Island Installation Hong Kong | Shell Hong Kong Limited |
Overfill Protection System on Storage at Shell MINA-AL-FAHAL Terminal | Shell Oman Marketing Company SAOG |
Additive H4661 Injection System at 5 no. PSOCL Terminals | Matrix Trading Services |
Installation of Thermal Relief System at Rawalpindi Terminal | Chevron Pakistan Limited |
Extension of Mogas Storage system at Machike | Total Parco |
Additive Injection System at Keamari Terminal “A” | Pakistan State Oil Company Limited |
Additive Injection System at Shikarpur | Pakistan State Oil Company Limited |
Additive Injection System at Jimco | Pakistan State Oil Company Limited |
Miscellaneous Civil Work at Shikarpur Installation | Shell Pakistan Limited |
Construction of RCC Floor at DP Keamari | Shell Pakistan Limited |
LUBE Jetty Pipelines Upgrade Tsing YI Island | Shell Hong Kong Limited |
Construction of 20KT Jet A-1 Storage Facilities at Keamari Installation | Shell Pakistan Limited |
Design of Water Storage Tank at West Wharf | Chevron Pakistan Limited |
Repair of Tank T-29 | Chevron Pakistan Limited |
Repair of Tank T-01 | Chevron Pakistan Limited |
Design and Detailed Engineering of LPG Bullet 250 M.Tons Capacity | Byco Petroleum Limited |
Design and Detailed Engineering of LPG Village having 20 LPG Terminals | Byco Petroleum Limited |
Capacity Increase of Liquid Storage Facility at Kabirwala Plant | Nestle Pakistan Limited |
Capacity Increase of Liquid Storage Facility at Shaikhupura Plant | Nestle Pakistan Limited |
100M3 Raw Water Storage Tank At PQA Karachi | Nestle Pakistan Limited |
Rotor Room Modification (Phase-I) | Chevron Pakistan Limited |
Repair of Tank CTX-23 | Chevron Pakistan Limited |
Repair of Tank CTX-20 | Chevron Pakistan Limited |
Dismantling Procedure for existing Storage Tank at DP Installation | Shell Pakistan Ltd. |
Repair of Tank CTX-22 | Chevron Pakistan Limited |
Repair of Tank CTX-05 | Chevron Pakistan Limited |
LPG Storage & Handling Facilities at ADHI | SHV Energy Pakistan (Pvt.) Limited |
Relocation and Construction of Fuel Oil Storage Tanks | Nestle Pakistan Limited |
Overfill Protection System on Storage Tanks at Keamari Installations | Shell Pakistan Limited |
Auto Tank Gauging System Provision on BCPL & BPL Storage TANKS | Byco Petroleum Limited |
Auto Tank Gauging at MKP-I | Byco Petroleum Limited |
Conversion of SP-18 into Super Service | Shell Pakistan Limited |
Auto Tank Gauging at MKP-I | Byco Petroleum Limited |
Machike Overfill Protection System | Shell Pakistan Limited |
Chaklala Overfill Protection System | Shell Pakistan Limited |
Design of Furnace Decoking System | Engro Polymer & Chemical Limited |
LPG Storage & Handling Facilities at ADHI | SHV Energy Pakistan (Pvt.) Limited |
Study of Bottom Loading Arm at DP Installation Keamari | Shell Pakistan Limited |
Installation of Bottom Loading Arms and Vapor Disposal System at Shell at Tarujabba Depot | Shell Pakistan Limited |
Engineering, Procurement, and Construction Management of Auto Tank Gauging System | Shell Oman Marketing Company |
Engineering Procurement Assistance & Construction Management (EPCM) Services for Conversion of Terminal 25, Oil Installation Area Keamari Karachi. | Pakistan Molasses Company (Pvt.) Ltd. |
Oily Water Collection and Disposal System at West Wharf | Chevron Pakistan Limited |
Oily Water Recovery System at Machike | Chevron Pakistan Limited |
Oily Water Recovery System at Rawalpindi | Chevron Pakistan Limited |
Project Management Services for Over Fill Protection System at Jabal Ali | Shell Markets (Middle East) Ltd |
Project Management Services for Tankage Optimization | Shell Hong Kong Ltd. |
Front End Engineering Design study and Debottlenecking of Hot Oil System, Gap analysis of CARIPHALTE Plant of Shell Market Middle East. | Shell Markets (Middle East) Ltd |
Detailed Engineering of Hot Oil Debottle Necking of CARIPHALT Plant at JABEL ALI Depot | Shell Markets (Middle East) Ltd |
Project Management Services for CARIPHALTE Plant | Shell Markets (Middle East) Ltd |
Additive Injection system for Bitumen at TYI – Hong Kong | Shell Hong Kong Ltd. |
Steam Audit and replacement of Easting Boilers at TYI – Hong Kong | Shell Hong Kong Ltd. |
Hot Oil Energy balance and replacement of Hot Oil Heater at TYI – Hong Kong | Shell Hong Kong Ltd. |
In-Line Blending facility for Bio-Diesel at TYI – Hong Kong | Shell Hong Kong Ltd. |
Hazardous Area Classification of entire installation TYI – Hong Kong | Shell Hong Kong Ltd. |
Design and Engineering of Polymeric modified Bitumen (PMB) facility at TYI – Hong Kong | Shell Hong Kong Ltd. |
Design Vetting of Arzoo International Terminal at Humriya Free Zone Sharjah | SGS |
Design Vetting of Premier Products Terminal at Humriya Free Zone Sharjah | ALSAA Petroleum |
Conversion of existing tanks into Resella-X service at TYI – Hong Kong | Shell Hong Kong Ltd. |
Storage Tank dead Stock reduction Design at TYI – Hong Kong | Shell Hong Kong Ltd. |
Completion and Submission of Design and Detailed Engineering of HSD Tank Conversion at Vehari Depot, | Shell Pakistan Limited |
Submission of Basic Design and gap Analysis report with recommendations of fire fighting system at Vehari Depot. | Shell Pakistan Limited |
Submission of report for the evaluation of existing over fill Protection system (vega system) at DP Installation Keamari | Shell Pakistan Limited |
Detailed drawings for the installation of Hydrant pit valves and Isolation pit valves at EJHD | Shell Pakistan Limited |
Design drawings boq specifications etc for the construction of AGO tank of capacity 10,000 M.Ton at Jamia and DP installation keamari | Shell Pakistan Limited |
Design and Engineering of Over fill Protection system at DP Installation-Keamari, | Shell Pakistan Limited |
Design and Engineering of Over fill Protection system at NDP Installation-Keamari | Shell Pakistan Limited |
Submission of design and detailed engineering of conversion of top Loading Arms | Shell Pakistan Limited |
Provision of Site Inspector Services at Shell Keamari Installations Karachi, | Shell Pakistan Limited |
Completion and submission of front end Engineering Design of Auto Tank gauging system at Taru Jabba Depot | Shell Pakistan Limited |
Jet A-1 Modification including pumps injectors piping modifications etc at DP installation Keamari Karachi | Shell Pakistan Limited |
Basic engineering including P&IDs plot Plan and cost estimates for fuel farm facility at new benazir bhutto international air port Islamabad | Shell Pakistan Limited |
Submission of additional work for basic engineering of 20 KT jet A1 storage facilities (package2) and Revival of existing gantry at NDP | Shell Pakistan Limited |
Basic engineering of 20 KT jet A1 storage facilities package 2 at NDP | Shell Pakistan Limited |
Design and detailed engineering of 20,000 M.Ton jet A-1 storage facilities at NDP installation Keamari scope includes detailed engineering | Shell Pakistan Limited |
Design and Detailed Engineering of Debottlenecking of excess flow through Mogas bottom loading arms and design of thermal relief system on Mogas loading system at Machike installation | Shell Pakistan Limited |
Design and detailed engineering of tank overfill protection system HHLA and atg at shikarpur installation | Shell Pakistan Limited |
Design and detailed engineering of tank overfill protection system HHLA and atg at Tarujabba Depot | Shell Pakistan Limited |
Design and detailed engineering of tank roof replacement of SP 02 at NDP installation | Shell Pakistan Limited |
Development of Critical As-Built drawings of Chaklala installation | Shell Pakistan Limited |
Critical As-Built drawings of Machike installation | Shell Pakistan Limited |
Critical As Built drawings of following Aviation Airfields of Shall Pakistan Ltd. | Shell Pakistan Limited |
Basic Engineering with cost estimates for the construction of Fuel Farm Facility at new Benazir Bhutto International Air Port Islamabad | Shell Pakistan Limited |
Technical Audit Gap Analysis of existing fire fighting system at Machike installation as per scope of work | Shell Pakistan Limited |
Miscellaneous civil work design at DP Keamari installation, Shikarpur installation,Chaklala installation, Machike installation and Taru jabba depot as per scope of work | Shell Pakistan Limited |
Design Basis Document with Cause and Effect Matrix Diagram for Chaklala Installation | Shell Pakistan Limited |
Design Basis Document with Cause and Effect Matrix Diagram for Machike Installation | Shell Pakistan Limited |
Travelling Charges for Vehari Boundary Wall Construction (02 Nos Engineers) | Shell Pakistan Limited |
Completion and submission of Critical As Built drawings of Taru Jabba Depot | Shell Pakistan Limited |
Completion and submission of Critical As Built drawings of Shell DP & NDP installation Keamari | Shell Pakistan Limited |
Completion and submission of Critical As Built drawings of Shell Sikarpur installation. | Shell Pakistan Limited |
Design Basis Document with Cause and Effect Matrix Diagram for DP & NDP installation Keamari | Shell Pakistan Limited |
Design Basis Document with Cause and Effect Matrix Diagram for Vehari Depot | Shell Pakistan Limited |
Design Basis Document with Cause and Effect Matrix Diagram for Shikarpur Installation | Shell Pakistan Limited |
Installation of IFC in SP-22 & SP-23 Mogas Conversion | Shell Pakistan Limited |
Gap Analysis of Existing Fire Fighting System At Vehari Depot | Shell Pakistan Limited |
Design Basis Document with Cause and Effect Matrix Diagram for TarujabbaDepot | Shell Pakistan Limited |
Installation of Master Meter & MOV at EJHD | Shell Pakistan Limited |
Safety Critical Drawings of Chaklala | Shell Pakistan Limited |
Upgradation of Safety Critical Drawings of SPL Machike Installation | Shell Pakistan Limited |
Electrical Survey at EJHD | Shell Pakistan Limited |
Calibration of PV Vent at CKL05 Chaklala | Shell Pakistan Limited |
PV Vent Pressure Setting/Installation of Semi Buried Tank at Chkala CKL01 & CKL05 | Shell Pakistan Limited |
Development of Safety Critical Drawings Vehari Depot | Shell Pakistan Limited |
Development of Safety Critical Drawings of Shershah Depot | Shell Pakistan Limited |
Development of Safety Critical Drawings of Bhakkar Depot | Shell Pakistan Limited |
Development of Safety Critical Drawings of Sahiwal Depot | Shell Pakistan Limited |
Development of Safety Critical Drawings of Chaklala Installation | Shell Pakistan Limited |
Development of Safety Critical Drawings of Taru Jabba Depot | Shell Pakistan Limited |
FWS installation design consultancy Proposal for the design and detailed engineering for the replacement of existing micronic filter by filter water separator at Nawabshah Air Port and Sukkur | Shell Pakistan Limited |
Basic Design and Cost Estimates of Bulk Oil Storage Depot at Gawadar-Baluchistan | Shell Pakistan Limited |
Construction of Ring Road and Watch Tower at Tarujabba | Shell Pakistan Limited |
Design and Detailed Engineering of Bio-Diesel B5 Loading Facility at Tsing Yi Installation-Hong Kong. | Shell Hong Kong Limited |
Design and Detailed Engineering of Polymer Modified Bitumen (PMB) Facility at Tsing Yi Installation-Hong Kong. | Shell Hong Kong Limited |
Design & Detailed Engineering for Supply & Installation ATG System & HLA System at NDP & DP Installation | Shell Pakistan Limited |
Basic Design for Replacement of Existing Jet Fuel Tanks Nos 1,2& 3 with New Tanks At Islamabad Airport | Shell Pakistan Limited |
Basic Design of Bitumen Receipt, Storage and Loading Facility at DP Installation-Keamari | Shell Pakistan Limited |
Design and Detailed Engineering of Bulk Oil (Bitumen, HFO, Mogas & Gasoil) Storage Terminal at Thilawa Port Region-Myanmar | National Infrastructure Holdings Co. Ltd. |
Design Vet and Basic Design of Bulk Oil Storage Terminal at Bhakkar | Elite Engineering (PVt.) Ltd. |
Surge Protection System At Chaklala, Machike Installation & Tarujabba Depot | Shell Pakistan Limited |
Upgradation of Existing Pump House At DP Installation Keamari | Shell Pakistan Limited |
Design and Detailed Engineering for the Conversion and Installation of V-Power at Machike Installation | Shell Pakistan Limited |
Upgradation of Tanker Discharge Pipelines (TDL) Dia. 8″ & Dia. 16″ | Shell Pakistan Limited |
Design and Detailed Engineering of Bulk Oil Storage Terminal at Sahiwal | Euro Oil (Pvt.) Ltd. |
Design Vet Consultant for the Bulk Oil Storage Terminal at Humriya-Sharjah. | Arzoo International |
Design and Detailed Engineering of Bulk Oil Storage Depot at Daulatpur | Laguardia Group of Companies |
Design and Detailed Engineering of LPG Storage and Loading Installation at Port Qasim-Karachi | Indus Refinery Ltd. |
Design and Detailed Engineering of Bulk Oil Storage Terminal at Sahiwal | The Fuelers (Pvt.) Ltd. |
CONVERSION OF MOLASSES TERMINAL INTO PETROLEUM STORAGE TERMINAL
CONVERSION OF MOLASSES TERMINAL INTO PETROLEUM STORAGE TERMINAL | QUANTITY |
Conversion of Molasses Terminal of Al-Rahimm Trading at Keamari into Petroleum Products. | Shell Pakistan Limited |
Conversion of Panama Edible Oil / Molasses Terminal at Keamari into Petroleum Products. | Al-Rahim Trading Co. |
Conversion of PMC Edible Oil / Molasses Terminal at Keamari into Petroleum Products. | Pakistan Molasses Company |
Conversion of Molasses Terminal of Al-Rahimm Trading at Keamari into Petroleum Products. | Total Pakistan Limited |
Conversion of Haji Dosa Edible Oil / Molasses Terminal at Keamari into Petroleum Products. | Al-Rahim Trading Co. |
Partial Conversion of KBS Edible Oil / Molasses Terminal at Keamari into Petroleum Products. | Al-Rahim Trading Co. |
Partial Conversion of KBS Edible Oil / Molasses Terminal at Keamari into Bitumen Storage & Handling. | Al-Rahim Trading Co |
Conversion of MEC Edible Oil / Molasses Terminal (#65/1) at Keamari into Petroleum Products. | Agro Trade (Pvt.) Ltd. |
Conversion of MEC Edible Oil / Molasses Terminal (#26) at Keamari into Petroleum Products. | Burshane Gas (Pvt.) Ltd. |
Conversion of Edible Oil / Molasses Terminal of Reliance Commodities Ltd. (RCL) at Keamari into Petroleum Products. | Fatima Group |
EDIBLE OIL/MOLASSES STORAGE TERMINAL
EDIBLE OIL/MOLASSES STORAGE TERMINAL | QUANTITY |
Design and Detailed Engineering of Bulk Edible Oil Storage Depot at Port Qasim | F.W.Q. Enterprises |
Design and Detailed Engineering of Bulk Edible Oil Storage Depot at Port Qasim | Sufi Group of Companies. |
Design and Detailed Engineering of Mapak Edible Oil Refinery at Port Qasim | Mapak (Pvt.) Ltd. |
Design and Detailed Engineering of Sufi Edible Oil Refinery at Port Qasim | Sufi Group of Companies. |
Design and Detailed Engineering of Sufi Edible Oil Refinery at Sheikhpura | Sufi Group of Companies. |
Design and Detailed Engineering of Edible Oil Refinery at Muredke-Pumjab | E2E (Pvt.) Ltd. |
Design and Detailed Engineering of Bulk Molasses Storage Depot at Port Qasim | Mapak (Pvt.) Ltd. |
Design and Detailed Engineering of Bulk Edible Oil Storage Depot at Port Qasim | Terminal-One (Pvt.) Ltd. |
AVIATION TERMINAL/INTO PLANE FACILITY
AVIATION TERMINAL/INTO PLANE FACILITY | QUANTITY |
Design and Detailed Engineering of Fuel Farm Facility at Islamabad Airport | Attock Petroleum Ltd. / PSO |
Design and Detailed Engineering of Into Plane Facility at Islamabad Airport | Attock Petroleum Ltd. / PSO |
Design and Detailed Engineering of Joint Users Hydrant Depot (JUHI Aviation terminal) at Katoka Airport-Accra | Shell Ghana Ltd. |
Design and Detailed Engineering of Fuel Hydrant Bay 67, 68 & 69 at Karachi Airport | Shell Pakistan Limited |
Design and Detailed Engineering of Fuel Farm Facility of Sialkot Airport | Pakistan State Oil Co. Ltd. |
Basic Design of Fuel Farm Facility and Into Plane Facility of New Benazir International Airport-Islamabad | Shell Pakistan Limited |
Basic Design & Cost Estimation of Fuel Farm Facility and Into Plane Facility of New Benazir International Airport-Islamabad | Pakistan State Oil Co. Ltd |
Re-location of JUHI Aviation Terminal at Katoka Airport-Accra | Shell Ghana Ltd. |
Design Vet Consultant for Dubai Airport Expansion Project | Shell Market Middle East |
Design and Detailed Engineering of 150KL Jet Fuel Storage tank at Islamabad Airport | Shell Pakistan Limited |
Design and Detailed Engineering of Fuel Farm Facility at Lahore International Airport | Pakistan State Oil Co. Ltd. |
Design and Detailed Engineering of Into Plane Facility at Lahore International Airport | Pakistan State Oil Co. Ltd. |
Re-vamping of Fuel Farm Facility at Eastern Joint Hydrant Depot (EJHD) of Karachi-Airport. | Shell Pakistan Limited |